Sign In | Join Free | My uabig.com |
|
Model NO. : BY-CC127
Usage : Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape : Round
Material Quality : Accept Third Party Inspection
Price Term : EXW Fob CIF CNF
Delivery Time : 7-10 Days
Tolerance : Wall Thickness Tolerance:+/-0.1mm
Grade : Q195/Q195L/Q235B
Thickness : 0.4-2.0mm
Outer Diameter : 12-114mm
Transport Package : Standard Export Package
Specification : Customized
Trademark : Bangying
Origin : China
Supply Ability : 80000tons /Year
After-sales Service : Oversea Jobs Available
Warranty : 3 Years
Type : Seamless
Technique : Hot Rolled
Material : Carbon Steel
Surface Treatment : Galvanized
Samples : US$ 1/kg 1 kg(Min.Order) | Request Sample
Customization : Available | Customized Request
Outer diameter | 12-114mm |
Thickness | 0.4 mm to 2.0mm |
Length | 2m to 12m or as per your request |
Zinc coating | 40-275g |
Tolerance | Wall thickness tolerance:+/-0.1mm,Outer diameter tolerance:+/-0.5mm,Length tolerance:-0/+20mm |
Standard | GB/T 3091; GB/T3094;GB/T6728; EN10219; ASTMA500; JISG3446,etc |
Grade | Q195,Q195B,Q235B,Q345B,ASTM A500 A/B;EN10219 S235 S275; JIS G3466 STKR400 |
Application | construction building, furniture ,machinery making, container, hall structure, sun seeker, offshore oil field, sea trestle, motorcar cassis, airport structure, shipbuilding, automobile axle pipe and so on. |
Packing |
|
Delivery Time | Around 7-10days after receiving the deposit |
Payment terms | 1)payment term:T/T or L/C,etc . 2)trade terms:FOB/CFR/CIF 3)minimum quantity of order:5 MT |
Galvanized steel pipe is the carbon steel pipe that are coated with a protective layer of zinc. The zinc layer served as a sacrificial layer, it will get rust before the carbon steel under neath it. Galvanized steel pipe include Two types: hot dipped galvanized steel pipe and cold galvanized steel pipe.
PACKAGING
Package | 1) Bundle with strip 2) Water-proof sheeting 3) Woven bags 4) PVC package 5) Clients' Requirements |
Shipping | 1) 20ft container: 26tons (Can load 5.8M Max) 2) 40ft container: 26tons (Can load 12M Max) 3) More than 100tons:can pack by bulk vessel 4) As your requirement |
Port of Shipment | Shanghai/Tianjin /Ningbo Port, China |
Date of Delivery | According to the quantity and specification of each order |
After you choose:
1. We will help to compare the most cheapest shipping cost and send it to your email.
2. Start production immediately after receiving the advance payment.
3.About 7-10 working days to complete the production, and then the customer side to pay the balance.
Choose us
FAQ
Q1: Do you provide free samples?
A:Of course, we can provide free samples to all over of the world for testing, buyer should bear the shipping cost.
Q2:What product information do I need to provide?
A:Please kindly provide the grade, width, thickness, surface treatment requirements, and the quantity to order.
Q3:It's my first time to import steel products, can you help me with it?
A:Sure, we have the shipping agent to arrange the shipment, and we will work together.
Q4:What ports of shipment are there?
A:Under normal circumstances, we ship from Shanghai, Tianjin, Qingdao, Ningbo ports, you can specify other ports, according to your needs.
Q5:What about product prices information?
A:Prices varied, according to periodic price changes of raw materials.
Q6:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance, balance before shipment or based on BL copy or LC at sight.
Q7:Do you provide ODM services?
A:Yes, if you have your own design, we can produce according to your specification and drawing.
Q8:What are the certifications for your products?
A:ISO 9001, MTC, third parties' inspections such SGS, BV, ect. are available.
Q9:How long does your delivery time take?
A: Generally it is 7 days if we have the exact goods in our stock. If not, it will take around15-20days to get goods ready for delivery.
Q10:How many countries you already exported to?
A:We have exported to America, Canada, Brazil, Chile, Colombia, Russia, Ukraine, Thailand, Myanmar, Vietnam, India, Kenya, Ghana, somalia and other African countries. Our export experience is rich, we familiar with different market demands, can help customers avoid a lot of trouble.
Q11:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory.
Q12:Does the product have quality inspection before loading?
A: Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed and customers can appoint third parties to inspect the products before loading too.
![]() |
Customized Galvanized Tube for Construction Schedule 40 Galvanized Steel Pipe BY-CC127 Images |